07 August 2006

We finished something! Call the press!

The living room is DONE (well, except for refinishing the floor, but we'll wait on that until the kids are older). We also got the carpet out of the dining room, and it looks an order of magnitude better, even with the hole in the ceiling. A million staples later, we have floors we are already happy with.

The bath is half tiled, all fixtures are in, and the only things waiting to be done (besides part 2 of the tiling) are the faucets on the shower wall (we must finish tiling and grouting first) and connecting the sink to the plumbing. All the weird, fiddly, awkward tiling is now complete.

The Amazing Debris Collection is almost gone. The next dumpster load is waiting next to the dumpster, and we have a few pieces left in the house.

I updated our budget sheet last night and we have spent about 4 grand on tools and materials so far. It sounds awful, but if we had hired people to do this for us, we would have spent 10-20 grand, just to get this far. Even if it would have gone faster, it wouldn't have gone much faster (and may have gotten slower). Our friends A and R hired folks to do all their work last year, and it took them 9 months to get into their house. It's a Stick style house, and it looks great now, but it was a fustercluck for a long time, there.

By the way, spellcheck hates "fustercluck" - and suggests I use "festers" instead. Apt.