My dad, though we don't always see eye-to-eye, is a great guy. He does things that drive me nuts (whose dad doesn't?), and amazing things that make me cry from their sheer wonderfulness. For example, when he helped us finance the house purchase, and what he did this weekend.
He's spent the past two days demoing out the powdered dryrot, painting what's left with Cuprinol (so I, breastfeeding mommy, don't have to), and reframing the now-missing bits. In between, while waiting for the copper green to dry, he's removing all the remaining carpet tackstrips.
I told him not to worry about insulating the addition or drywalling it, because I can do that, and also because he's one of those "lucky" ones that gets more than itchy from installing fiberglas (He gets a full-blown case of allergic dermatitis, no matter how well covered he is). If he can spare me some discomfort and exposure to things I can't be exposed to (mold, copper green), the least I can do is spare him some in return.
Thanks, Daddy. I can't even tell you how much it means that you've helped us out like this. Especially now. It's the best birthday present in the world.
House: 1910s probably Aladdin Readi Cut kit house. Desperately in need of love and restoration.
Slaves: One woman, experienced house restorer; one man, experienced in new construction.
Budget: small.
21 August 2006
17 August 2006
Powdered House
I finished demoing out the ceiling in the diningroom bay addition yesterday.
Me: "OH MY GOD. It's powder. This was a beam."
EMT J (as distinct from Wiring J): "Is that like cancer for a house?"
Me:"Yes. Hopefully, it's operable, and not terminal."
We discovered the dryrot. Lots of it. In a place I was hoping against hope wasn't dryrotted. And after I stopped swearing, I made a plan of attack.
There was a leak from the rain gutter, maybe 30 years ago, that was allowed to EAT AWAY THE SUPPORT MEMBERS of about a 2'x8' section of the bay roof. And the roofers who "fixed" it just put up a really heavy sheathing board over the hole (I'm guessing 1" ply, since I can SEE it through the approximately 2x1 foot ragged hole in the old tongue and groove sheathing). The 4x4 beam that runs across the face of the wall has been reduced to powder in one place, and to an uneven 1x4 in others. The crosspieces that allegedly rest on it are damaged, so they really more hang near it.
The bay is literally being held up by the roof sheathing resting on the house sheathing (thankfully, some hard wood in big planks, topped with good solid wood lap siding). Oh, and the windows, with their trim.
Shudder. SH@# F@#& D#^* M@&^*@#$^$@#!
So, we have a lot of yanking of trim and reframing to do, which puts us back a good week or two, optimistically. Last night, we bought a shopvac to "demo" the powdered wood with, plus some filter bags to catch the yuck. Today, we are off to buy the replacement lumber.
Good thing we already have a nice stash of salvaged 2x4's. We'll need them to build the temporary supports.
Me: "OH MY GOD. It's powder. This was a beam."
EMT J (as distinct from Wiring J): "Is that like cancer for a house?"
Me:"Yes. Hopefully, it's operable, and not terminal."
We discovered the dryrot. Lots of it. In a place I was hoping against hope wasn't dryrotted. And after I stopped swearing, I made a plan of attack.
There was a leak from the rain gutter, maybe 30 years ago, that was allowed to EAT AWAY THE SUPPORT MEMBERS of about a 2'x8' section of the bay roof. And the roofers who "fixed" it just put up a really heavy sheathing board over the hole (I'm guessing 1" ply, since I can SEE it through the approximately 2x1 foot ragged hole in the old tongue and groove sheathing). The 4x4 beam that runs across the face of the wall has been reduced to powder in one place, and to an uneven 1x4 in others. The crosspieces that allegedly rest on it are damaged, so they really more hang near it.
The bay is literally being held up by the roof sheathing resting on the house sheathing (thankfully, some hard wood in big planks, topped with good solid wood lap siding). Oh, and the windows, with their trim.
Shudder. SH@# F@#& D#^* M@&^*@#$^$@#!
So, we have a lot of yanking of trim and reframing to do, which puts us back a good week or two, optimistically. Last night, we bought a shopvac to "demo" the powdered wood with, plus some filter bags to catch the yuck. Today, we are off to buy the replacement lumber.
Good thing we already have a nice stash of salvaged 2x4's. We'll need them to build the temporary supports.
07 August 2006
We finished something! Call the press!
The living room is DONE (well, except for refinishing the floor, but we'll wait on that until the kids are older). We also got the carpet out of the dining room, and it looks an order of magnitude better, even with the hole in the ceiling. A million staples later, we have floors we are already happy with.
The bath is half tiled, all fixtures are in, and the only things waiting to be done (besides part 2 of the tiling) are the faucets on the shower wall (we must finish tiling and grouting first) and connecting the sink to the plumbing. All the weird, fiddly, awkward tiling is now complete.
The Amazing Debris Collection is almost gone. The next dumpster load is waiting next to the dumpster, and we have a few pieces left in the house.
I updated our budget sheet last night and we have spent about 4 grand on tools and materials so far. It sounds awful, but if we had hired people to do this for us, we would have spent 10-20 grand, just to get this far. Even if it would have gone faster, it wouldn't have gone much faster (and may have gotten slower). Our friends A and R hired folks to do all their work last year, and it took them 9 months to get into their house. It's a Stick style house, and it looks great now, but it was a fustercluck for a long time, there.
By the way, spellcheck hates "fustercluck" - and suggests I use "festers" instead. Apt.
The bath is half tiled, all fixtures are in, and the only things waiting to be done (besides part 2 of the tiling) are the faucets on the shower wall (we must finish tiling and grouting first) and connecting the sink to the plumbing. All the weird, fiddly, awkward tiling is now complete.
The Amazing Debris Collection is almost gone. The next dumpster load is waiting next to the dumpster, and we have a few pieces left in the house.
I updated our budget sheet last night and we have spent about 4 grand on tools and materials so far. It sounds awful, but if we had hired people to do this for us, we would have spent 10-20 grand, just to get this far. Even if it would have gone faster, it wouldn't have gone much faster (and may have gotten slower). Our friends A and R hired folks to do all their work last year, and it took them 9 months to get into their house. It's a Stick style house, and it looks great now, but it was a fustercluck for a long time, there.
By the way, spellcheck hates "fustercluck" - and suggests I use "festers" instead. Apt.
06 August 2006
Some progress, some regression, and some blessings counted.
I'm counting my blessings, lest I sink into despair. There will be no moving in this week. FX will come home to an unfinished house, even if he will have a play area to use while we work.
Why? We have fixtures in the bath now, and even some tile (Thanks, MOM!), but that's not really done yet. That's the progess. However, in the process of getting there, we discovered that the toilet we wanted to keep was Done For.
After re-installing it. Sigh. Off to the Home Improvement Store (this time it was Menard's) for a new toilet, a cheap new toilet, and other necessities. Unforseen spending later, (under 200 bucks, really, so we got out cheap, but it was still not budgeted for) there is, once again, a toilet in our new bathroom.
Well, if we have to move for any reason, we can advertise it as having "all new fixtures" in the bath. I don't want to move, this house has ahold of my soul.
Now to the livingroom carpet. Remember the carpet dream? Well, it was partially prophetic - that horrible carpet was on a pad that was either glued down or that degraded in a manner most foul. We've been scraping for two days, and we only have 1/3 of the floor exposed. I see refinishing in my future - but, at least, not sanding. Scrubbing, on hands and knees, and revarnishing, but no sanding in this room, at least.
Why? We have fixtures in the bath now, and even some tile (Thanks, MOM!), but that's not really done yet. That's the progess. However, in the process of getting there, we discovered that the toilet we wanted to keep was Done For.
After re-installing it. Sigh. Off to the Home Improvement Store (this time it was Menard's) for a new toilet, a cheap new toilet, and other necessities. Unforseen spending later, (under 200 bucks, really, so we got out cheap, but it was still not budgeted for) there is, once again, a toilet in our new bathroom.
Well, if we have to move for any reason, we can advertise it as having "all new fixtures" in the bath. I don't want to move, this house has ahold of my soul.
Now to the livingroom carpet. Remember the carpet dream? Well, it was partially prophetic - that horrible carpet was on a pad that was either glued down or that degraded in a manner most foul. We've been scraping for two days, and we only have 1/3 of the floor exposed. I see refinishing in my future - but, at least, not sanding. Scrubbing, on hands and knees, and revarnishing, but no sanding in this room, at least.
01 August 2006
The Clock is Ticking
We are supposed to be moved in, at least enough to to consider ourselves to be residing in our house, by the time my older son returns from Texas. We have until the 9th.
Tick, tick, tick...
Understandably, between this and the heatwave, I've stopped sleeping. I decided, therefore, to get out of bed at 4 am and go paint my living room. It seemed like a ggod idea, and lo, by 8 am, there was a successful paintjob, even if I had to stop and patch a couple of cracks I hadn't fixed yet, mid-painting. Our living room now only requires the border papers (2 hours) and removal of the Vile Pea-Green Shag Carpet (however long it takes, I'll enjoy every ripping, wrenching moment).
It already looks Really Nice. The greys I picked really set off the cherry-stained woodwork, and the wood floor, once completely revealed, should just make it that much more wonderful.
tick
I still have work to do on the bath, but it should be in its temporary usable stage by Thursday night. Toilet, sink, tub, cheap plastic temporary flooring... Not lovely, but a place to go. A water-resistant place, at least, and that's always an improvement.
tick
I've decided to just Make Do with our bedroom. I can re-hang the window skirting board, patch what needs patching, and paint, paint, paint. We have Way Too Much To Do left to really make this livable before moving in (like patching in the floorboards where the curtain wall was, finishing the raw flooring in the former closet, resetting the mouldings, and pulling down the boards the acoustic tiels were stapled to) to worry about things like scraping out two rooms worth of hideous layered wallpaper. Unless it comes down Very Easily. I already pulled up the carpet, but put iback down to protect the floor from our construction.
tick
I Really Must finish the painting in the kitchen, for safety reasons. There's the old flaky wall that I'm still only halfway through scrubbing with a wire brush, which also needs patching (natch) as well as painting afterwards.
tick
Then, we have our Fabulous Debris Collection. It's been preventing work on the dining room (we won't even go there - we plan to get that mostly done AFTER number one son comes home) and the porch (which, mercifully, needs little work done) for two months. The dumpster finally arrives tomorrow morning. I await its appearance with ... cynicism. There's a reason we've been collecting debris for months, and it was a dumpster shortage. I really do hope we can get it, though.
Tick, tick, tick...
Tick, tick, tick...
Understandably, between this and the heatwave, I've stopped sleeping. I decided, therefore, to get out of bed at 4 am and go paint my living room. It seemed like a ggod idea, and lo, by 8 am, there was a successful paintjob, even if I had to stop and patch a couple of cracks I hadn't fixed yet, mid-painting. Our living room now only requires the border papers (2 hours) and removal of the Vile Pea-Green Shag Carpet (however long it takes, I'll enjoy every ripping, wrenching moment).
It already looks Really Nice. The greys I picked really set off the cherry-stained woodwork, and the wood floor, once completely revealed, should just make it that much more wonderful.
tick
I still have work to do on the bath, but it should be in its temporary usable stage by Thursday night. Toilet, sink, tub, cheap plastic temporary flooring... Not lovely, but a place to go. A water-resistant place, at least, and that's always an improvement.
tick
I've decided to just Make Do with our bedroom. I can re-hang the window skirting board, patch what needs patching, and paint, paint, paint. We have Way Too Much To Do left to really make this livable before moving in (like patching in the floorboards where the curtain wall was, finishing the raw flooring in the former closet, resetting the mouldings, and pulling down the boards the acoustic tiels were stapled to) to worry about things like scraping out two rooms worth of hideous layered wallpaper. Unless it comes down Very Easily. I already pulled up the carpet, but put iback down to protect the floor from our construction.
tick
I Really Must finish the painting in the kitchen, for safety reasons. There's the old flaky wall that I'm still only halfway through scrubbing with a wire brush, which also needs patching (natch) as well as painting afterwards.
tick
Then, we have our Fabulous Debris Collection. It's been preventing work on the dining room (we won't even go there - we plan to get that mostly done AFTER number one son comes home) and the porch (which, mercifully, needs little work done) for two months. The dumpster finally arrives tomorrow morning. I await its appearance with ... cynicism. There's a reason we've been collecting debris for months, and it was a dumpster shortage. I really do hope we can get it, though.
Tick, tick, tick...
29 July 2006
We're Different Here
Some girls call Mom for cooking advice; "Hi, Mom? What makes your gravy taste so good?"
I call home for ... help with obscure restoration and construction techniques; "Hi, Mom? Did we buy the right kind of mortar for this job? The label says..."
We're definitely a bit on the odd side.
In other news, the plumbing revisions are Just About Done. We expect to have the bath ready for fixtures tonight - And the water back on! It's essentially waiting on me, as I have to finish mounting the tilebacker boards before we can do things like putting the toilet back.
The plumbing revisions include, by the way, repair/replacement of the scary rubber hose that formed part of the kitchen sink waste pipe, and relocation of the showerhead to point above my husband's when the tub basin height is calculated in.
It's progress, and I'm not sure I trust it. Don't pinch me - I don't want to wake up.
I call home for ... help with obscure restoration and construction techniques; "Hi, Mom? Did we buy the right kind of mortar for this job? The label says..."
We're definitely a bit on the odd side.
In other news, the plumbing revisions are Just About Done. We expect to have the bath ready for fixtures tonight - And the water back on! It's essentially waiting on me, as I have to finish mounting the tilebacker boards before we can do things like putting the toilet back.
The plumbing revisions include, by the way, repair/replacement of the scary rubber hose that formed part of the kitchen sink waste pipe, and relocation of the showerhead to point above my husband's when the tub basin height is calculated in.
It's progress, and I'm not sure I trust it. Don't pinch me - I don't want to wake up.
21 July 2006
Almost brought to you, Again, by Sisyphus Productions!
I don't have to procrastinate - my life does it for me.
So, I did in fact need a new tetanus shot, as the old one was nearly expired, and some antibiotics (Keflex), for the ensuing infection, and some new shoes. And several days with my feet up. Argh. My left foot was ... very much larger than it should have been, and entirely too pink, when I went to the ER on Monday. I got ordered to take it easy.
I get to go back to the house today and put up hardibacker in the gutted bath. After a week. So we can have a toilet and shower and sink in there, and, eventually, we will get to move in. I just want a functioning toilet, and sinks, and tub. Is that so much to ask? That end looks ever so distant. I feel little feather-like ticklings of despair.
Hopefully getting things completed for this part will make me feel less piteous. Action always helps, but renovation always seems to block that therapeutic activity.
So, I did in fact need a new tetanus shot, as the old one was nearly expired, and some antibiotics (Keflex), for the ensuing infection, and some new shoes. And several days with my feet up. Argh. My left foot was ... very much larger than it should have been, and entirely too pink, when I went to the ER on Monday. I got ordered to take it easy.
I get to go back to the house today and put up hardibacker in the gutted bath. After a week. So we can have a toilet and shower and sink in there, and, eventually, we will get to move in. I just want a functioning toilet, and sinks, and tub. Is that so much to ask? That end looks ever so distant. I feel little feather-like ticklings of despair.
Hopefully getting things completed for this part will make me feel less piteous. Action always helps, but renovation always seems to block that therapeutic activity.
16 July 2006
bathroom demo complete, plus bonus wound report
Look, the idiot is dancing again. But this time, she is limping.
The good news: the bath demo is done! The tiny tub (very HEAVY but also tiny) is out, and awaiting removal* in our otherwise empty living room. The appallingly designed, 1970's, also tiny (below crotch level on a small woman), sink vanity was ripped out (and destroyed) with glee yesterday. The sink and bath had a strange synergy going - the tub is a wave-front, streamline designed built-in tub, and the vanity was a flat-sided box that was installed rightupagainst the tub, leaving a little pocket between the head of the tub and the side of the vanity, where water and a half dozen washcloths had gathered over the years.
Not surprisingly, I had to rip out several punky floorboards, but the subfloor is very intact, which means that patching that spot on the floor before installing the tilebacker is going to be a piece of cake (all supply lines run through the wall, so no cutouts even need to be made!). Yuck, but fixable. AND - no termite damage, just old mold rot, which is now well dried out (the house was not lived in for 2 years before we bought it and we didn't use the tub or sink at all) and gone.
All the Vile Stinky Tile Adhesive came down with the plaster coat it had been attached to. The bare lath looks a heck of a lot better, and smells better too. Funny how much bigger the little room looks when it's empty...
We have elected to keep the old, high-flow toilet, as we like it, but it's getting pulled gently and set aside until the hardibacker is laid and skimmed.
The plumbing is demoed, too, so now we know what we need to get - and what we forgot to get. Like the tub overflow valve...and the drain pipe parts. Nothing quite like discovering you forgot to get something essential when elbows deep in a job. Sigh. We also have nowhere to go when working on the house. Well, I have nowhere to go. For the guys, there are plenty of trees in the backyard...
The bath wiring is also complete - J was putting in the two new GFI outlets as we left last night. The box for the wall fixture was put in, and the ceiling fixture was pulled out (even if it's nice, I really don't need to climb 9 feet up to screw around with a wet fixture to change bulbs in the middle of the night). The hole will probably end up holding a through-attic vent, since the enclosed back porch covers the only window.
That window opens, but it hinges open against the showerhead. The window predates any shower in that bath, so it's a matter of old laziness (I think the PPO, when they fixed the house up for sale in 1949). I say this as it is an easy fix - swap the hinges and latch from one side to the other. I want to pull and strip the hardware anyway, so why not fix this issue now?
We have also come to a decision about the 1940's - 1950's medicine cabinet - we're selling it. We'll put in either the original cabinet (found under the bay addition, and in need of restoration) or an equivalent repro. Craftsman-style wall cabinets are popular and can be had fairly cheaply these days, so it comes down to whichever is the less expensive option for now.
Now, we get to the limping part. I caught my shoe on a multi nailed scrap yesterday, and thinking I had shaken it off, put weight on my foot. No such luck - it had caught me and I got punctured. My foot HURTS, but the nail was a clean one, I've had a Tetanus shot in the past few years (in '99) and we have a first aid kit handy. My foot still hurts, though. I'll live.
* This gets mentioned last. My husband was theorizing yesterday about uses for the ex-tub. Like a fishpond, or planter. In the yard. I think he's pulling my chain. I hope he's pulling my chain. I'm all about reuse, but that's a little rednecky, even for me.
Here's an example of his sense of humor:
My advice? Don't sit on the smudged lid of a spackle can in black pants when he's around ... whether he has a camera or not.
The good news: the bath demo is done! The tiny tub (very HEAVY but also tiny) is out, and awaiting removal* in our otherwise empty living room. The appallingly designed, 1970's, also tiny (below crotch level on a small woman), sink vanity was ripped out (and destroyed) with glee yesterday. The sink and bath had a strange synergy going - the tub is a wave-front, streamline designed built-in tub, and the vanity was a flat-sided box that was installed rightupagainst the tub, leaving a little pocket between the head of the tub and the side of the vanity, where water and a half dozen washcloths had gathered over the years.
Not surprisingly, I had to rip out several punky floorboards, but the subfloor is very intact, which means that patching that spot on the floor before installing the tilebacker is going to be a piece of cake (all supply lines run through the wall, so no cutouts even need to be made!). Yuck, but fixable. AND - no termite damage, just old mold rot, which is now well dried out (the house was not lived in for 2 years before we bought it and we didn't use the tub or sink at all) and gone.
All the Vile Stinky Tile Adhesive came down with the plaster coat it had been attached to. The bare lath looks a heck of a lot better, and smells better too. Funny how much bigger the little room looks when it's empty...
We have elected to keep the old, high-flow toilet, as we like it, but it's getting pulled gently and set aside until the hardibacker is laid and skimmed.
The plumbing is demoed, too, so now we know what we need to get - and what we forgot to get. Like the tub overflow valve...and the drain pipe parts. Nothing quite like discovering you forgot to get something essential when elbows deep in a job. Sigh. We also have nowhere to go when working on the house. Well, I have nowhere to go. For the guys, there are plenty of trees in the backyard...
The bath wiring is also complete - J was putting in the two new GFI outlets as we left last night. The box for the wall fixture was put in, and the ceiling fixture was pulled out (even if it's nice, I really don't need to climb 9 feet up to screw around with a wet fixture to change bulbs in the middle of the night). The hole will probably end up holding a through-attic vent, since the enclosed back porch covers the only window.
That window opens, but it hinges open against the showerhead. The window predates any shower in that bath, so it's a matter of old laziness (I think the PPO, when they fixed the house up for sale in 1949). I say this as it is an easy fix - swap the hinges and latch from one side to the other. I want to pull and strip the hardware anyway, so why not fix this issue now?
We have also come to a decision about the 1940's - 1950's medicine cabinet - we're selling it. We'll put in either the original cabinet (found under the bay addition, and in need of restoration) or an equivalent repro. Craftsman-style wall cabinets are popular and can be had fairly cheaply these days, so it comes down to whichever is the less expensive option for now.
Now, we get to the limping part. I caught my shoe on a multi nailed scrap yesterday, and thinking I had shaken it off, put weight on my foot. No such luck - it had caught me and I got punctured. My foot HURTS, but the nail was a clean one, I've had a Tetanus shot in the past few years (in '99) and we have a first aid kit handy. My foot still hurts, though. I'll live.
* This gets mentioned last. My husband was theorizing yesterday about uses for the ex-tub. Like a fishpond, or planter. In the yard. I think he's pulling my chain. I hope he's pulling my chain. I'm all about reuse, but that's a little rednecky, even for me.
Here's an example of his sense of humor:
My advice? Don't sit on the smudged lid of a spackle can in black pants when he's around ... whether he has a camera or not.
12 July 2006
Renovating the Blog
I'm thinking that, now we have accomplished something (Power! Which means we can turn on the gas soon - Hot Water!) and are approaching done-ness on several others, it may no longer be simply depressing to have a project tracker widget on here. So I might just add one. One of those bars will be labelled "moving in" as I think it will take us a few weeks to really get settled.
Also, I was watching HGTV and the DIY network and thinking (this gets dangerous, what with the smoke pouring from my ears and all) about doing a weekly how-to feature on here, just give me something to do while feeding BabyJames other than watching tv. It would be more of a "how I did this" with step-by-step instructions for those who might be facing the same things. Like how to live with (or just plain refinish) old steel kitchen cabinets, doing a successful wall application of stickytiles, or faking a built-in. Stuff like that. The temporary stuff, the superficial stuff, the decorative stuff.
In other news, DOver books emailed me that they've got some new Architecture books out. Go take a look. I've already spotted at least four that I want, and only one that I need. And they've got a 25% off sale on as well.
Also, I was watching HGTV and the DIY network and thinking (this gets dangerous, what with the smoke pouring from my ears and all) about doing a weekly how-to feature on here, just give me something to do while feeding BabyJames other than watching tv. It would be more of a "how I did this" with step-by-step instructions for those who might be facing the same things. Like how to live with (or just plain refinish) old steel kitchen cabinets, doing a successful wall application of stickytiles, or faking a built-in. Stuff like that. The temporary stuff, the superficial stuff, the decorative stuff.
In other news, DOver books emailed me that they've got some new Architecture books out. Go take a look. I've already spotted at least four that I want, and only one that I need. And they've got a 25% off sale on as well.
06 July 2006
Dancing Idiot has a Baby. Film at 11.
Well, I'm now off bedrest - the baby is here. James Edward was born Jume 17th at 2 am on the dot, preceded by much screaming and accompanied by a great deal of relief. He's doing great, and so am I ... now.
It's been almost 3 weeks since then and I've finally gotten back into the house (first because of the bedrest and then the postpartum healing/in-law visits) to do a bit of work. I did actually get a few things done this afternoon, between removing the old storm door from what is now an interior doorway and wandering around the house a lot. I also got some progress made on my older son's bedroom murals, after discovering that the midnight blue mismix we bought for his ceiling had been mismarked, too. It's lavender. I guess I can figure out a use for a pint of lavender paint, but I was thwarted in my plans for the day.
"Oh, poor me, I'll have to go to the home store again for supplies. Whatever shall I do?"
Also, our sainted freind and electrical engineer J got the wiring/box/etc in place for the power company to come in and do the meter and service upgrade. That's tomorrow. I'm doing a happy dance, but that doesn't translate well in print. This is a good thing, as I look like an idiot - a happy idiot, but an idiot nonetheless.
The bad: we've discovered that the drainpipe from the kitchen sink needs replacement, in a rather unfortunate way - it fell off. Well, better to have found that out before we do all the other plumbing work, no? We plan to do that stuff next week, and I think we can fit a bit more PVC pipe into the budget. We'll have to, or no move-in before FX gets back from visiting our relations in Texas.
It's been almost 3 weeks since then and I've finally gotten back into the house (first because of the bedrest and then the postpartum healing/in-law visits) to do a bit of work. I did actually get a few things done this afternoon, between removing the old storm door from what is now an interior doorway and wandering around the house a lot. I also got some progress made on my older son's bedroom murals, after discovering that the midnight blue mismix we bought for his ceiling had been mismarked, too. It's lavender. I guess I can figure out a use for a pint of lavender paint, but I was thwarted in my plans for the day.
"Oh, poor me, I'll have to go to the home store again for supplies. Whatever shall I do?"
Also, our sainted freind and electrical engineer J got the wiring/box/etc in place for the power company to come in and do the meter and service upgrade. That's tomorrow. I'm doing a happy dance, but that doesn't translate well in print. This is a good thing, as I look like an idiot - a happy idiot, but an idiot nonetheless.
The bad: we've discovered that the drainpipe from the kitchen sink needs replacement, in a rather unfortunate way - it fell off. Well, better to have found that out before we do all the other plumbing work, no? We plan to do that stuff next week, and I think we can fit a bit more PVC pipe into the budget. We'll have to, or no move-in before FX gets back from visiting our relations in Texas.